Complete an inspection

Inspections in the status STARTED can be completed.

If all mandatory inspection instructions have been executed and an inspection result has been determined, the inspection can be completed.

If the action Process Inspection is completely executed, the inspection is also automatically completed.
  1. Choose Inspection Management > Inspections in the Navigation Pane.
  2. Find and select the inspection.
  3. Do one of the following:
    • Click Complete Inspection in the toolbar.
    • Right-click on the inspection and choose Complete Inspection in the shortcut menu.
      If not all mandatory inspection instructions have been carried out yet, an overview is given of the missing results.
  4. In the option group Info with Result, the proposed inspection result is displayed. To manually adjust the proposed inspection result, click Override Result , and select the desired inspection result in the drop-down menu Result. If applicable, enter an extra explanation for this adjustment under Description, and click Finish.
    At Result, both the old and the new result are displayed.

    The manual adjustment of the inspection result is saved in Events.

  5. Check the proposed QC status changes in the option group QC Status. Depending on the type of inspection and the settings in the Configurator, an adjustment of the QC status of the Serial Number, the LPN or LPN Set, the Entire Lot or the Entire Inbound Line/Production Output can be updated. Click Finish to complete the inspection.
    The status of the inspection is changed to COMPLETE.