View replenish tasks of open replenishments
The tab Replenish Tasks displays the tasks that are to be completed to execute the replenishment.
For example: An order has been received for 10 LPNs of foil. No foil is left at the pick location, so replenishment should take place. The replenishment is registered in the tab Open Replenishments. For each LPN that is to be moved to the pick location, a replenish task is generated. These tasks appear in the tab Replenish Tasks. As soon as a replenish task has been completed, this is registered in the tab Replenishment Track & Trace.
A replenish task can be held, reset or closed. The task priority can be adjusted, the LPN content can be viewed and events can be viewed.