Unplan the operation (via Gantt diagram)

One or more operations can be removed from the Gantt diagram by unplanning the operation.

  1. Choose Production Management > Planning Cells in the Navigation Pane.
  2. Select the planning cell.
  3. Choose the tab Planning.
  4. Click Recall Planning Wizard .
  5. Click Add Filter Field .
    The dialog box Wizard Add Filter Field will appear.
  6. For more information, see Add filter fields via a default list.
    • Check the Start fields to filter according to the start time of the operations, select the suitable criterion from the drop-down menu and select the value.
    • Check the Stop fields to filter according to the stop time of the operations, select the suitable criterion from the drop-down menu and select the value.
    • Check the field Item Name to filter according to the item being produced. Select the suitable criterion from the drop-down menu and enter the value.
    • Check the field Recipe Name to filter according to the item being produced. Select the suitable criterion from the drop-down menu and enter the value.
  7. Click Next.
  8. Select the operations that must be unplanned.
  9. Click Finish.
    The dialog box Unplan Operation may appear with an overview of the operations that could not be unplanned. The overview also lists the reasons why they could not be unplanned.