LPN production inspection

When an LPN is produced, it is evaluated whether inspections should be carried out for the produced LPN. This is done according to the LPN production inspection rules. The LPN production inspection rules determine which inspection sheets should be created for which item or inspection group, for which customer and based on which set frequency. The inspection sheet will show the inspection instructions depending on the frequency set for the relevant inspection instruction. If the operator confirms an LPN creation in the production dialog boxes, then it will be assessed whether inspections must be carried out. If there are one or more inspections that should be carried out for the created LPN, the operator will receive a message. If the operator confirms, these inspections will be finalized in the inspection dialog boxes. However, the operator is not required to carry out the inspections first. If a putaway task is linked to the created LPN, and the LPN has outstanding inspections on the RF device, then the putaway task will have the status PENDING (INSPECTION) until the inspection process on the RF device is stopped.

If configured that inspections should take place in the inspection context 'LPN set', the LPNs that must be inspected according to the rules will be added to an LPN set automatically. In this way, multiple LPNs that share an item can be checked in one joint inspection.

An inspection can also be added to a lot or LPN manually.