LPN Receipt inspection

When a receipt is confirmed, it is evaluated whether inspections should be carried out on the received LPN. This is done according to the LPN inbound inspection rules. The LPN inbound inspection rules determine which inspection sheet must be created based on the item, inspection group, supplier, customer, carrier and set frequency. The inspection sheet will show the inspection instructions depending on the frequency set for the relevant inspection instruction. If there are one or more inspections to be carried out for the inbound LPN, the operator will receive a message.

If the operator confirms, these inspections will be finalized in the inspection dialog boxes. However, the operator is not required to carry out the inspections first. If a putaway task is linked to the inbound LPN, and the LPN has outstanding inspections on the RF device, then the putaway task will have the status PENDING (INSPECTION) until the inspection process on the RF device is stopped.

An inspection can also be added to an LPN manually.