Add an operation to a recipe

  1. Choose Recipe Management > Recipes in the Navigation Pane.
  2. Select the version.
  3. Choose the tab Operations.
  4. Click Add Operation .
  5. Select a resource type in the dialog box Wizard Add Operation.
  6. Click Next.
  7. Select the operation.
  8. Click Finish.
  9. To change the sequence of the operations, select an operation and use the arrows Move Up , Move Down .
    If working with a balanced production line with repair operation (module One Piece Flow Line Balancing), also add this repair operation to the recipe. This is the operation where the option Is Repair is checked in procedure Add an operation to a resource type. This operation will be marked as (REPAIR) in the Navigation Pane.
  10. Add data to the operation, see Recipe operations.