Add an input to an operation

  1. Choose Recipe Management > Recipes in the Navigation Pane.
  2. Unfold in the Navigation Pane the tree structure of the Recipes and My Recipes, and subsequently the tree structure of the desired recipe, the variant and the version.
  3. Choose the tab Operations and select the operation.
  4. Choose the tab Inputs.
  5. Click Add Input .
  6. Select an item in the dialog box Wizard Add Input.
  7. Click Next.
  8. In Quantity, enter the required quantity of the item to execute the operation.
  9. Where applicable, check Fixed. This will ensure that the input quantity is not adjusted if the quantity produced is more or less than the default quantity.
  10. Click Finish.
  11. Repeat steps 5 up to and including 10 to add more items.

    To change the sequence of the items:

    Select the item and use the arrows to adjust the sequence.

    The sequence of the items can be used to display the items in the correct sequence in the resource view.

    If required, an input can be copied from on operation to another.