View dynamic parameters of an operation

As soon as an operation is planned, it can be viewed which parameter configurations will be withheld. A distinction is being made between the following types:
  • GENERAL: These parameters are applicable in the relevant context, but are not transferred via an instruction. These can be displayed on the MES Operator Client via the resource view. Besides dynamic parameters, this element also contains the parameters consisting in a fixed value or attribute.
  • INSTRUCTION: These parameters are transferred via a setup, data collection or measurement instruction.
  1. Choose Production Management > Production Orders. Search for and select the production order.
  2. Choose the tab Operations and select the operation.
  3. Choose the vertical tab Quality sub tab Parameters.
    Parameters which are applicable for the instruction, but for which no parameter configurations are applicable for the relevant production order, are displayed in red. In that case, it is not possible to release the production order. It can be viewed via the following step at which criterion the wrong configuration manifests. Edit the configuration where necessary so the dynamic parameters can be found.
  4. It can be viewed for each dynamic parameter how it came about. To do this, select the desired parameter and click Resolve Path . In the dialog box Resolve Path, the system logic is visualized in the following option groups:
    Option GroupExplanation
    Parameter Definition The results are determined for the relevant parameter definition.
    Context The entire context (Recipe, Item (Group), Resource (Type), Operation) is known when the order is planned. The system can, by combining these data with the parameter configurations, determine which configuration has the best match, and which standard value (and possibly upper and lower limits) will be withheld.
    Resolve Path The followed system logic is visualized in order of priority here. After each criterion, it is shown how many configuration candidates are still left.
    Result After the last criterion, an overview is given of the resulting configuration candidates. The candidate which will be withheld in the end (best match based on the most priority criteria), is displayed in green.
    Click OK after having finished viewing the resolve path.
    This action is not possible for lines which contain an attribute or a fixed value.