Split an OEE target

For an existing production process with set targets you can set a new period with edited targets.

  1. Choose Production Management > OEE Targets in the Navigation Pane.
  2. Select a production process with fixed OEE targets in the Data Pane.
  3. Do one of the following:
    • Click Split OEE Target in the toolbar.
    • Right-click the selection and choose Split OEE Target in the shortcut menu.
  4. In the option group Split Date click Date Selection and choose the date at which the new period starts and edit the targets.
  5. In the option group Settings, enter the targets.
    OptionsSettings
    OEE The OEE target. See OEE figure.
    Availability The target for availability. See Availability (OEE2).
    Productivity The target for productivity. See Productivity (OEE3).
    Quality The target for quality. See Quality (OEE4).
    Capacity The target for capacity. See Capacity (OEE1).
  6. Click Finish.