Validate requirements

When validating the requirements the validation rules are executed again, for example to check whether too much availability has been assigned to a requirement. If the rules are not adhered to, an anomaly will be displayed.

  1. Choose Capacity Management > Planning Cells in the Navigation Pane.
  2. Select the planning cell.
  3. Choose the tab Planning in the Data Pane.
  4. Use a time filter to select the desired period.
  5. Select one or more requirements in the requirements pane.
  6. Right-click the selection and choose Validate Requirements in the shortcut menu.