Load the requirements
Requirements are usually loaded automatically according to a schedule set in the Configurator.
For example: Daily at 13:30 hrs.
Availabilities can also be loaded manually by the supervisor.
Requirements are usually loaded automatically according to a schedule set in the Configurator.
For example: Daily at 13:30 hrs.
Availabilities can also be loaded manually by the supervisor.