Add Input consumption
This functionality enables the user to add input consumptions for LPN and bulk items
                used in production.
        
                    
  | 
- 
                Select the job for which you want to Add Input
                        Consumption.
                See Select a job.
 - Choose the tab WIP In.
 - At the bottom of the tab, choose Details.
 - 
                Click Add Input Consumption
                    
 in the toolbar.
             - 
                In the option group Input Info of the dialog box
                        Add Input Consumption Wizard, choose one of the
                    following:
                
Field Explanation LPN Do one of the following:
- Enter an LPN ID
 
- Click Select LPN
                                        
 or press Alt +
                                            S, select an LPN from the list, and click
                                            Finish 

- There are no restrictions for LPNs on the BOM of the operation.
 - However, once the user selects the LPN, the wizard will verify that it is part of the Bill of Materials (BOM)
 
Item Do one of the following:
- Enter an Item ID
 - Click Select Item
                                        
 or press
                                            Alt + I, select the item from the
                                        list, and click Finish. 

Items are restricted to the BOM of the operation. Lot Do one of the following:
- Enter a Lot ID
 - Click Select Lot
                                        
 or press
                                            Alt + L, select the lot from the
                                        list, and click Finish. 

LOT inventory are restricted to the BOM of the operation.  - Choose one or more LPN or bulk items from the option Inventory.
 - 
                In the option group Quantity, do one of the
                    following:
                
Field Explanation Consumption Enter the new consumed quantity of the inventory.

The unit of measurement can be changed. Choose the required Unit from the drop-down. New Quantity Enter the new available quantity of the inventory.

When an additional input consumption is added, the system automatically decreases the available quantity of the inventory to account for this additional consumption. It updates the quantity of the new available inventory to reflect the additional consumption or vice versa. 
A warning appears to verify the inventory to ensure the selected inventory is not assigned to another allocation or task.  - Click Finish.
 
