Select an interrupt on a job
- Choose Production Management in the Navigation Pane.
-
Do one of the following:
- Choose a department, machine, work center, resource group or planning cell.
- Choose My 'Element'.
- Choose a filter.
- Choose the tab (for example ).
- Use a time filter to enter the desired period.
- Select one or more jobs.
- Click the sub tab Interrupts.
- Select the interrupt.