Analysis rework history

When an item is rejected, it can still be reworked in order to comply with the quality requirements.

  1. Choose Production Management in the Navigation Pane.
  2. Search for and select a department, machine, work center, resource group, production order, planning cell, employee, recipe, item or tool.
  3. Select the respective tab ... Analysis (for example Machine Analysis) in the Data Pane.
  4. Choose the tab Reworked.
  5. Use a time filter to select the desired period.
  6. At the bottom select the tab Rework History.