Analysis NRFT Pareto

All items that were once rejected had an increase of this number as a result, even though it has been reworked in the mean time.
  1. Choose Production Management in the Navigation Pane.
  2. Search for and select a department, machine, work center, resource group, production order, planning cell, employee, recipe, item or tool.
  3. Select the respective tab ... Analysis (for example Machine Analysis) in the Data Pane.
  4. Choose the tab Reject.
  5. Use a time filter to select the desired period.
  6. Select NRFT Pareto at the bottom of the tab.