Jump to main content
Analysis NRFT Pareto
All items that were once rejected had an increase of this number as a result, even though it has been reworked in the mean time.
-
Choose Production Management in the Navigation Pane.
-
Search for and select a department, machine, work center, resource group, production order, planning cell, employee, recipe, item or tool.
-
Select the respective tab ... Analysis (for example Machine Analysis) in the Data Pane.
-
Choose the tab Reject.
-
Use a time filter to select the desired period.
-
Select NRFT Pareto at the bottom of the tab.