Finite capacity scheduler
By means of the scheduler, the planning can automatically be optimized based on a number of definable criteria. This is done by taking the live planning offline, generating the best possible planning and putting the planning back online.
The criteria that can be used to optimize the panning are captured in a number of objectives. The following objectives are used by default:
- Makespan
- Tardiness
- Maximum Tardiness
- Late Orders
- Total Lag
- Resource Usage
- Changeovers