Configuration
First configure the Employees (17).
Next, configure the Days (14), and subsequently the Attendance Patterns (15).
Next, configure the Attendance Groups (16), the Day Codes (8), the Balance Codes (9) and the Anomaly Reasons (12).
Finally, configure the rules.