Edit an anomaly
Only an anomaly that have been manually added by the supervisor can be edited.
- Choose Navigation Pane. in the
- Select the planning cell.
- Choose the tab Planning in the Data Pane.
- Use a time filter to select the desired period.
- Select one or more requirements with an anomaly in the requirements pane or one or more availabilities with an anomaly in the availability pane.
- Choose the tab Anomalies in the requirements detail pane or in the availability detail pane.
- Select the anomaly in the detail pane.
-
Do one of the following:
- Click Edit Anomaly in the vertical toolbar.
- Right-click the selection and choose Edit Anomaly in the shortcut menu.
-
Do one of the following to edit the reason for the anomaly:
- In the field Reason, enter the name of the reason.
- Click Filter Anomaly Reasons , select an anomaly reason and click Finish.
- Where applicable, change the description of the anomaly.
- Click Finish.