Navigate the Gantt diagram
- Choose Attendance Management in the Navigation Pane.
- Choose the element Employees, Employee Groups or Departments in the Navigation Pane.
-
Do one of the following:
- Select a filter.
- Select My 'Element'.
- Select one employee, employee group or department.
- Choose the tab Attendance Overview > Gantt in the Data Pane.
- Use a time filter to select the desired period.
-
To navigate the Gantt diagram, do one of the following:
- Use the horizontal or vertical scroll bar to navigate.
- Use the arrow keys to navigate.
- Click or to zoom in and out.
- Click or to move to the first planned or last planned item.
- Click to view the planning from the current time onwards.
To drag the time line do the following:
- Drag the scroll bar at the bottom.
- Click and drag in the time line.
To zoom in and out in the planning board do the following:
- CTRL + scroll wheel.
- SHIFT + click and drag in the time line.