Navigate the Gantt diagram

  1. Choose Attendance Management in the Navigation Pane.
  2. Choose the element Employees, Employee Groups or Departments in the Navigation Pane.
  3. Do one of the following:
    • Select a filter.
    • Select My 'Element'.
    • Select one employee, employee group or department.
  4. Choose the tab Attendance Overview > Gantt in the Data Pane.
  5. Use a time filter to select the desired period.
  6. To navigate the Gantt diagram, do one of the following:
    • Use the horizontal or vertical scroll bar to navigate.
    • Use the arrow keys to navigate.
    • Click or to zoom in and out.
    • Click or to move to the first planned or last planned item.
    • Click to view the planning from the current time onwards.

    To drag the time line do the following:

    • Drag the scroll bar at the bottom.
    • Click and drag in the time line.

    To zoom in and out in the planning board do the following:

    • CTRL + scroll wheel.
    • SHIFT + click and drag in the time line.